Modern Aerofication Methods Inc

Modern Aerofication Methods IncModern Aerofication Methods IncModern Aerofication Methods IncModern Aerofication Methods Inc
  • Home
  • Services
    • Fairways
    • Greens Deep Tine
    • Conventional Aerification
    • Deep Drill
    • Verti Cutting Service
    • Core Collector
    • Double Deep
    • Rebuilds & Repair
    • Parts & Tines
  • Videos
    • Coring Fairways
    • Solid Tine Fairways
    • Deep Tine Greens
    • Deep Drill Greens
    • Conventional Aerification
    • Core Collector
  • Contact

Modern Aerofication Methods Inc

Modern Aerofication Methods IncModern Aerofication Methods IncModern Aerofication Methods Inc
  • Home
  • Services
  • Videos
  • Contact
image89

DOUBLE DEEP

Call for for information on this process

  • Drill 5" x 5" centers 28,800 conduits per 5,000 sq ft.
  • Soil reliever 4" lateral spacing 3.75" forward spacing = 48,000 conduits per 5000 sq ft. 

Total of 76,800 conduits per 5,000 sq ft = 1.5  tons of sands per sq ft. 

Modern Aerofication Methods Inc

PO Box 825 Waddell, AZ 85355 USA

(623) 853-0485 or (602) 741-8327

Copyright © 2020 Modern Aerofication Methods Inc - All Rights Reserved.